What needs a building permit in Joondalup
| Project | No building permit if |
|---|---|
| Shed | Freestanding, 10 m² or less, 2.4 m or less, installed to the maker's instructions |
| Patio or louvre roof | Standalone, 10 m² or less, 2.4 m or less |
| Pergola | 20 m² or less and 2.4 m or less |
| Shade sail | Standalone, 20 m² or less, 2.4 m or less (attached sails always need one) |
| Carport, garage, granny flat | Always needs a building permit |
If your project also needs planning approval, Joondalup says the building permit can only be issued after planning approval.
How to apply
- Check planning first. Most sheds, patios and pergolas on house lots don't need planning approval if they meet the R-Codes and city policy.
- Pick certified or uncertified. A certified application (BA1) comes with a Certificate of Design Compliance from a private building surveyor. For an uncertified one (BA2), the City checks the plans.
- Use the right checklist. Joondalup has checklists for each project type, listing the plans and documents it needs.
- Lodge online through the City's portal (preferred) or by mail. You'll get an invoice for the fee.
- Answer any questions. If something is missing, you usually have 21 days to supply it.
Once the application is complete, the City decides a certified application within 10 working days and an uncertified one within 25 working days. When the work is finished, the builder must lodge a BA7 notice of completion within 7 days.
Fees
| Fee | Amount |
|---|---|
| Building permit, certified, house or Class 10 | 0.19% of the value, at least $121 |
| Building permit, uncertified | 0.32% of the value, at least $121 (state rate) |
| Building Services Levy | $61.65 for work up to $45,000 |
| Planning approval, work up to $50,000 | Up to $147 |
| Planning approval, $50,000 to $500,000 | Up to 0.382% of the cost |
| Planning approval for work already done | An extra penalty of twice the normal fee |
| Deemed-to-comply check | $295 |
| Written planning advice | $73 |