When you need a building permit
The Town of Bassendean says you need a building permit before you start building work, unless the work is exempt. You also need a demolition permit before pulling a building down, with a few small exceptions.
What Bassendean says is exempt
The Town's exempt works sheet lists these common jobs that usually don't need a permit:
- Patios, sheds and gazebos that stand on their own and are no more than 10 m² and 2.4 m high.
- Pergolas and shade sails on a house, no more than 20 m² and 2.4 m high.
- Fences that aren't masonry and are no more than 1.8 m high. Front fences may still need planning approval, and any pool fence needs a permit.
- Retaining walls no more than 500 mm high that don't hold up another structure.
- Rainwater tanks up to 5,000 litres, and solar panels or hot water systems on a house or its outbuilding (but not the stands or towers they sit on).
- Masts and antennas up to 3 m freestanding, or 2 m above where they attach to a building.
- Cosmetic work like cabinets and non-structural repairs.
A pool or spa that can hold more than 30 cm of water always needs a permit, including portable and inflatable pools. Exempt work still has to meet the building rules and the R-Codes, and may still need planning approval. More on this in what doesn't need a building permit.
Demolition
You may not need a demolition permit to take down a patio, shed, pool or similar structure of up to 40 m², as long as it's safe (for example, no asbestos) and the building isn't under a heritage order. Bigger jobs use a BA5 form. See demolition permits in WA.
BA1 or BA2
Every permit comes with a Certificate of Design Compliance. Lodge a BA1 if a private building surveyor gives you the certificate, or a BA2 if you want the Town to do it. The Town must answer a BA1 within 10 business days and a BA2 within 25 business days. Not sure which? Read BA1 vs BA2.
How to lodge
The Town prefers applications by email to mail@bassendean.wa.gov.au. Paper copies are accepted but slow things down. If your work touches a neighbour's land or fence, you'll need their consent on a BA20 or BA20A form.
Council fees
The Town's information sheets list these fees (check the current schedule before you lodge):
- BA1 application fee: $121 for work under $50,000, or 0.19% above that.
- BA2 (permit and certificate together): $121 for work under $34,375, or 0.32% above that.
- Building Services Levy: $61.65 for work under $45,000, or 0.137% above that.
- Construction Training Fund levy: 0.2% for work over $100,000, paid to the CTF before the permit is issued.
Built something without a permit?
Bassendean has an information sheet on getting approval for unauthorised work. This usually means a building approval certificate (BA13). Call the Town on (08) 9377 8000.