Question answer

What doesn't need a building permit in WA?

Short answer

In WA you don't need a building permit for a freestanding shed, patio or gazebo up to 10 m² and 2.4 m tall, an open pergola or shade sail up to 20 m², a dividing fence up to 2 m, a rainwater tank up to 5,000 L, solar panels and cosmetic renovations. Pools, pool fences and anything attached to the house always need one. Planning rules still apply to exempt work.

Last updated 30 October 2026

WA's Building Regulations 2012 (Schedule 4) list the small jobs that don't need a building permit. Councils apply the same state list, so the limits below are the same across Perth. Here they are in plain English, using the City of Gosnells' summary of the list.

The exemption list

WorkNo building permit needed if
Shed, patio or gazeboFreestanding, 10 m² or less and 2.4 m tall or less
Shade sail or pergola (open, no solid roof) next to a house20 m² or less and 2.4 m tall or less
Colorbond or fibre cement dividing fence2 m high or less and not forward of the house
Rainwater tank5,000 litres or less
Solar panels or hot water system on a house or its outbuildingAlways exempt, unless the roof needs structural changes or a stand to hold them
Freestanding mast, antenna or flagpole3 m tall or less (2 m above the roof if attached to a building)
Cosmetic renovationsCabinetry, new benchtops, painting and non-structural repairs
Roof-mounted evaporative air conditioner in a bushfire-prone areaBAL-Low, or BAL-12.5 to BAL-29 with a unit that meets the bushfire standard
Demolishing a patio, shed, pool or similar40 m² or less, no asbestos risk and not heritage-protected (no demolition permit)

Things that always need a permit

  • Any swimming pool or spa that can hold 30 cm of water or more, including portable and inflatable pools.
  • Any pool safety fence, whatever its height or material.
  • Anything attached to the house, such as a patio, carport or verandah, at any size.
  • Garages, carports and granny flats.
  • Structural changes, such as removing a load-bearing wall or adding a room.

"Exempt" doesn't mean "no rules"

This catches a lot of people. An exemption only means you don't need a building permit. As the City of Gosnells puts it, exemption "does not negate the need for other required approvals, such as Development Approval and Health Approval, or the need to comply with statutory requirements, such as the National Construction Code and the Residential Design Codes".

So a small exempt shed still has to sit the right distance from your fence, stay out of the front yard and be built properly. If it breaks a planning rule, it needs planning approval even though it needs no building permit. Nobody signs off exempt work, so getting it right is up to you.

Is there a 7-year rule?

No. WA has no rule that makes unapproved work legal after 7 years (or any number of years). Work done without a required permit stays unauthorised until it is approved. The fix is a building approval certificate, which a registered building surveyor inspects and certifies.

Not sure?

Use our 20-second approval checker, or the form finder if you already know you need a permit.

Sources

Questions

Common questions

What's the biggest shed I can build without a permit in WA?

A freestanding shed with a floor area of 10 m² or less and no taller than 2.4 m. That is about 3 m x 3.3 m. Anything bigger, taller or attached needs a building permit.

Do I need a permit for a pergola in WA?

Not for an open pergola (no solid roof, or only shade cloth) next to a house if it is 20 m² or less and 2.4 m tall or less. A pergola or patio with a solid roof follows the 10 m² rule instead.

Do I need a permit for a Colorbond fence?

Usually not for a dividing fence up to 2 m high that doesn't come forward of the house. Front fences, fences over 2 m, retaining under a fence and any pool fence can need one.

Do I need a permit to put solar panels on my roof?

No building permit for panels on a house or its outbuilding, as long as the roof doesn't need structural changes and the panels don't need a stand or frame that changes the structure.

Hand over the paperwork.

Pick your project, tell us about it, and we take it from there: plans, forms, council, and updates until your permit is issued.

Get a quoteCall