Do you need a building permit in the City of Swan?
The City of Swan follows the same state rules as every WA council. Most new buildings and many additions need a building permit before work starts. Some small structures are exempt, such as a freestanding garden shed of 10 m² or less and no more than 2.4 m high. Check first with our list of what doesn't need a permit.
A building permit is separate from planning approval. If your project also needs planning approval, get that first.
Which form to use
| BA1 (certified) | BA2 (uncertified) | |
|---|---|---|
| Who checks the plans | A private registered building surveyor, before you lodge (they issue a BA3 certificate) | The City of Swan's building surveyors |
| What it can be used for | Any building | Houses (Class 1a), sheds, garages, carports, patios, pools and other Class 10 structures only |
| Time the City has to decide | 10 business days | 25 business days |
The clock starts at midnight the day after the City receives a complete application. Not sure which suits you? Read BA1 vs BA2.
How to lodge
- Online through the City's ePathway portal. The City says online is its preferred way.
- By email to the City's lodgement address, in person at 2 Midland Square, Midland, or by post.
You can track your application online. The tracker shows key milestones, not every step.
If the City asks for more information
You must send it within 21 days, or the application may be refused. An incomplete application may also be refused, and the City says fees are unlikely to be refunded. So it pays to get the paperwork right the first time.
Government fees
These are set by the state and are usually the same at every council:
| Fee | Amount |
|---|---|
| BA1 permit (house or Class 10) | 0.19% of the value, at least $121 |
| BA2 permit | 0.32% of the value, at least $121 |
| Building Services Levy | $61.65 for work up to $45,000; 0.137% above that |
Work out yours with the building permit fee calculator. The City's own schedule of fees covers other charges, like copies of old plans.
After the permit
Build to the approved plans, and lodge a notice of completion (form BA7) within 7 days of finishing. If the City refuses your application, you can appeal to the State Administrative Tribunal.