What doesn't need a permit
| Work | No building permit if |
|---|---|
| Patio, shed or gazebo | Freestanding, up to 10 m² and 2.4 m high |
| Pergola or shade sail with a house | Up to 20 m² and 2.4 m high |
| Colorbond dividing fence | Up to 2 m high and not forward of the house |
| Rainwater tank | Up to 5,000 litres |
| Solar panels or hot water system on the house | Usually exempt |
| Demolishing a patio, shed or pool | Up to 40 m² |
Pools and spas 300 mm or deeper always need a permit. Being exempt from a building permit doesn't mean you can skip planning approval or the building rules.
How to apply
- BA1 (certified): for any building, with a Certificate of Design Compliance (BA3) from a registered building surveyor. The City has 10 business days to decide. The City also offers its own certification service.
- BA2 (uncertified): only for houses (Class 1a) and sheds, patios and carports (Class 10). The City checks the plans and has 25 business days.
Lodge online through the City's portal with one copy of each document, plus a verge permit application if you'll use the verge. Incomplete applications aren't accepted. If the City asks for more information, you have 21 days to provide it.
Before you lodge
Any other approvals must already be in place: planning approval if needed, health approval for a septic system, and owner-builder approval if you're managing work over $20,000 on a house (or over $50,000 for a shed, patio or carport) without a registered builder.
Planning approval is only needed for a house or minor structure if it breaks the R-Codes' standard rules, a local development plan or a local planning policy. The City decides within 60 days, or 90 with neighbour comment.
After you build
Lodge a BA7 notice of completion within 7 days of finishing, with proof of any inspections the permit asked for. There are penalties if you don't.