The short version
In WA, building work that needs a permit and is worth over $20,000 (or $50,000 for sheds, carports and garages) must be done by a registered builder or by you as an approved owner-builder. Both are legal. The difference is who carries the risk.
| Owner-builder | Registered builder | |
|---|---|---|
| Who manages the job | You: trades, quality, safety and inspections | The builder |
| Approval before the permit | Owner-builder approval from the state, usually 6 to 8 weeks | None for you. The builder is already registered |
| Who signs the permit form | You, as the builder | The builder and all owners |
| Fixing faults | You, for at least 7 years | The builder |
| How often | Usually once every 6 years, unless a waiver is granted | No limit |
| Selling within 7 years | You need home indemnity insurance for the buyer | The builder's insurance covers it |
When owner-building makes sense
- You have time to run the job and are happy to manage trades.
- You plan to live in the home (or use the shed or carport yourself) and not sell or rent it straight away. This is a rule for owner-builders.
- You have done an owner-builder course, or already have building industry registration, plus a white card.
When a registered builder is the better pick
- You may sell within 7 years. Owner-builders stay responsible for faults and must arrange home indemnity insurance before selling.
- The land is owned by a company or trust. Owner-builders must be individuals.
- You have owner-built in the last 6 years and don't have a waiver.
- You need the work started soon, and can't wait 6 to 8 weeks for owner-builder approval.
What doesn't change
Either way you still need a building permit, and planning approval if the work doesn't meet the R-Codes. Licensed work like electrical and plumbing must still be done by licensed trades. Hiring trades doesn't take away an owner-builder's legal duties.
Check if you need approval with the owner-builder checker, see which BA form you need, or read about engineer costs in Perth.